Ingka Group acquires Locus! Built for the real world, backed for the long run. Read here>Read the full story>
Ingka Group acquires Locus! Built for the real world, backed for the long run. Read the full story

Locus latest blogs

General

Delivery Experience Playbook for 11.11 and 12.12: Turning the SEA Mega Sale Into Repeat Purchases

A 28-day countdown for SEA e-commerce operations: set the promise, ready the carriers, build tracking and exception messaging, run the surge and recover into repeat purchases.

General

Top Logistics Automation Software Platforms in 2026 for Smarter Operations

Compare the top logistics automation software platforms of 2026. Find the right execution-led dispatch tool, TMS suite, or specialized freight system based on your operational model.

General

How to Reduce Last-Mile Delivery Costs Without Sacrificing Service Quality

Reducing last-mile delivery costs without sacrificing quality demands a systematic approach balancing efficiency with customer experience. The most successful strategies blend smart technology, flexible operations, and continuous optimization.

General

Integration Change Management: Versioning and Deprecation for Logistics APIs in 2026

Logistics integrations break when a carrier, ERP or vendor changes a field. How to classify changes, signal deprecation, test contracts and run shadow tests before cutover.

General

Peak-Ready Integrations: Designing Logistics Connectivity for Volume Spikes in 2026

Integrations fail at peak through rate limits, retry storms and stale queues, not outages. Six steps to design logistics connectivity that holds when volume spikes.

General

Integration Ownership in Logistics: A RACI for When the Connection Breaks

When a TMS, ERP or carrier connection breaks, three teams and a vendor each assume another owns it. A RACI, escalation tiers and a first-30-minutes runbook that fix that.

General

Reattempt Assignment: Turning a Failed Delivery Into a Recovered One in 2026

A failed first attempt is a decision, not a default. How to assign the reattempt by reason, customer availability and route capacity, and recover the delivery in 2026.

General

North America Control Tower Scorecard: 7 Criteria for US and Canadian Shippers in 2026

A 21-point scorecard for US and Canadian shippers choosing a control tower, with seven tests built on UPS and FedEx network changes, Canada Post disruptions and the border.