Search for:

Locus latest blogs

General

Real-Time Visibility Coverage in Canada: Why 94% National is 40% Where it Counts

Avatar photo

Aseem Sinha

Aug 28, 2026

National coverage is a volume-weighted average, and in Canada feed coverage inverts against consequence. How to weight coverage by recovery cost and represent a leg you cannot see.

General

Real-Time Visibility Ends at Handover: Tracking the COD Cash Chain in Southeast Asia

Avatar photo

Anas T

Aug 28, 2026

In high-COD Southeast Asian markets a delivery is also a payment. Real-time visibility instruments the parcel to the second and the money not at all. The custody chain, and what to measure.

General

Who is Allowed to See it: Designing a European Control Tower Around Jurisdictional Access Limits

Avatar photo

Ishan Bhattacharya

Aug 28, 2026

Multi-country visibility programmes are scoped on coverage and capped by permission. The four limits that decide what a European control tower may display, and what to specify before you procure.

General

A US CFO’s Guide to AI Investment in Last-Mile Delivery Efficiency: Proving the Savings Arrived

Avatar photo

Aseem Sinha

Aug 28, 2026

Building the business case is the solved half. Twelve months later, four confounders have invalidated the baseline you forecast against. How to attribute realized savings defensibly, and what to fix at approval time.

General

Delivery Promise Accuracy: The Last-Mile Efficiency Metric That Predicts Repeat Purchase

Avatar photo

Aseem Sinha

Aug 28, 2026

Your on-time rate is measured against a window operations set. Promise accuracy is measured against what the customer was shown at checkout. They are different numbers, and only one predicts whether they order again.

General

Which Integration to Fix First: Ranking Feed Risk by Irreversibility in 2026

Avatar photo

Anas T

Aug 28, 2026

Build-sequencing criteria rank integrations by SLA impact, volume, and lead time. An operating estate needs one more property: whether the decision a feed gates can be taken back.

General

Degraded Mode Dispatch: What Operations Should See When a Feed Goes Stale in 2026

Avatar photo

Ishan Bhattacharya

Aug 28, 2026

A broken integration produces an error. A stale one produces a confident plan built on old state. What the dispatcher needs to see at the moment of decision, and how autonomy should respond to input quality.

General

Route Optimisation Saves Emissions You Cannot Report: The Scope 3 Counterfactual Problem in 2026

Avatar photo

Anas T

Aug 27, 2026

Routing data is not the reason you cannot report the emissions your optimisation saved. The number operations wants to claim is not the number Scope 3 permits. The methodology forks and counterfactual designs that survive assurance.